Applications

Hong Kong International Airport

In the Hong Kong Airport Authority's third runway terminal project, Horry applied design management's early metrics to dynamically analyze the constructability of E&M assemblies, and performed integrated coordination and simultaneous modeling of the integrated piping layout design and module prefabrication assembly design on a regular and high-frequency basis to determine the logical location of the E&M project that would be of implementation significance and value for money. 

Learn more
Contact Horry now →